Help support the Mego Museum
Help support the Mego Museum

Announcement

Collapse
No announcement yet.

ST:TMP Drydock - larger scale

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • NemVia
    Museum Patron
    • Oct 12, 2007
    • 123

    ST:TMP Drydock - larger scale

    Greetings Everyone!

    I am starting on a New Larger Scale ST:TMP DRYDOCK made to fit the DeBoers Scale Enterprise. Right now I have most of the model blueprinted for the sections that I need for reference for when I actually start construction.

    I will have a serious advantage with this build in that I was able to go see the original DRYDOCK model in person. From this I was able to make hundreds of notations and many reference pictures of this incredible miniature. On my first Drydock build I had only ST:TMP DVD as a reference and whatever photos that were floating around on the internet at the time. But now I can be as accurate as possible with this new scale. The only thing I would like to point out though is please, please do not ask me to post any of the pics that I took of the miniature. I was allowed in good faith to take the pics that I did as long as I would not publish them. So, please be considerate of this request. There will be no further discussion of this issue and private requests will be deleted. Thank you for respecting this wish.

    The only thing I can assure you of is that what you see in this build will be a very accurate representation of the model. With that in mind, this last month I was able to start construction of a MASTER of one of the light panels. This will be used for mold making and YES, this time I will be casting the majority of the parts for this build. This should cut down the build time dramatically. I am going to be casting the parts in black resin to reduce the need to opaque the pieces for light leaks. I will also be trying a new kind of lighting that will reduce the need for soldering, LEDs and exposed wiring and excessive heat build up.

    I have also been asked to work out some moldings and castings for another 1/350 scale drydock build. These updates will be included on the DRYDOCK LARGE SCALE page. By the next update I am hopeful to have some of the moldings done and a few of the castings ready for pics.

    In the Updates for March I just have one pic of the Enterprise models in their cradle docks. These cradles make it much easier to not only move the models, but also to work on them. Shoulda finished these months ago but..... busy. Anyway, on the drydock page I have several drawings of the model-to-be's basic designs and some pics of the light panel Master. I will have more of the details added on by the next update. See you then,

    Mark
    Last edited by NemVia; Jul 11, '17, 4:31 PM.
    ...Once it's activated, there's no way to stop it! - Scotty: DMa
    www.NemVia.org
  • NemVia
    Museum Patron
    • Oct 12, 2007
    • 123

    #2
    I have several pics in this month's update which I think are very awesome. At least for me. Continuing on with the drydock build I was able to make some molds for both the fronts and backs of the light panels. I also made a few test casts to see if they would turn out the way I wanted. I found a few things I wanted to improve on with both of the molds. I want to be able to add the lighting effects without having to add any extra parts or drill any additional holes. I'm really trying to think this build all the way through, guys. So I'll take the extra time needed so if I every build additional drydocks I will have everything in place. I've been trying to learn from my past Drydock Build which took about a year and a half to build entirely from scratch. I really never dreamed I would build another dock much less a larger version of it. But I did learn a really valuable lesson from that experience and yes, "CASTING" is going to be the way to go for a highly detailed model like these.

    In other areas I've also finished making the master for the underneath of the overhead modules. I was able to do a lot of kit bashing for the detailing work. I tried to follow the basic patterns on the original filming miniature as close as possible. I tried to find pieces that resembled what was on TMP Dock. I was able to make a single piece mold for this part. I then tried casting this piece and the results were fantastic. At this posting I was able to cast 14 of the panels for one of the Docks. As I brought out in my last month's update I am casting all of the parts in Black resin. This will reduce light leaks as well as the need for spraying all of the parts Flat Black. I have several pics posted of these panels. Check them out.

    Along with the bottom panels I have also finished the master for the side walls of the Modules and have begun work on the front right and front left pieces where the landing bays are. I should have these pieces completely detailed as well as molds for casting the pieces. So check out the new pics in the April Updates Page and let me know what you think. Next Month's update should be awesome as well. See you then!

    Happy modeling, Mark
    Last edited by NemVia; Jul 11, '17, 4:31 PM.
    ...Once it's activated, there's no way to stop it! - Scotty: DMa
    www.NemVia.org

    Comment

    • NemVia
      Museum Patron
      • Oct 12, 2007
      • 123

      #3
      The last month has been very productive, mainly with some massive amounts of resin casting. Since there are 2 docks being built, here are the numbers for completed casting as of this update: All 28 of the lower module panels are now cast, the 28 upper panels are finished as well. The 8 front and rear panels are finished. I've been able to cast 36 of the 56 side panels. There are 112 light panel fronts for the sides and overhead modules, so far I have 29 of those done. There are 84 rear light panel pieces and so far I've been able to do 9 of them. These take a little longer because they made with a 2 piece mold. All the other pieces are one piece mold. I've been going through a lot of resin as well. I've used 3 gallons each of Part A and Part B and I'll be ordering another 2 gallons for the rest of the parts that need to be cast.

      For the rest of the work done this month I've been sanding off the excess resin from the larger pieces. I've purchased some aluminum c-channel for the framework to support all of the panel pieces. I've also been buying some steel c-channel so I can get the framework built for the model support armature and I've been looking into the metal tubing for the light panel frames that will be worked on a little ways down the road. In the meantime, I've been drilling out the mounting holes to start assembling everything. As of this update I was able to assemble at least one of the modules completely. There are some great pictures of how this looks in the MAY UPDATES page. There are 27 new pics for this update. There is still a lot of casting to do so I'll be quite busy for the next month. I can't wait to get started on the painting, but I need to get these modules finished first.

      So let me know what you think of the pics. and I'll have more next month!

      See you then,

      Mark
      Last edited by NemVia; Jul 11, '17, 4:31 PM.
      ...Once it's activated, there's no way to stop it! - Scotty: DMa
      www.NemVia.org

      Comment

      • NemVia
        Museum Patron
        • Oct 12, 2007
        • 123

        #4
        June Updates - 2013

        June Updates


        This month has been a little frustrating as far as getting a lot of work done on the modules. I had a hard time finding some specific sized sheet metal screws for mounting some of the side walls. I was finally able to find what I needed and get going on the build again. I also needed to make a few new molds for some of the cast parts, mainly the outer light panel frames. I finally figured out what the problem was and was able to correct it. A word to those who are new to casting parts that have some undercuts to the parts: Make sure you use a vacuum chamber to de-gas everything even if the label says you don't need to. I've found that for de-gassing a silicon mold for about 10 minutes has made the smoothest molds for my casting purposes. It works! Believe me!

        I've also had to figure out a way to make a new mold for the backs of the light panels. Although the details on the front parts of the molds came out great, I kept having problems with top edges of the sides where the front panel frame would eventually connect with it. Since this needed to be a two piece mold I was not able to evacuate all of the air bubbles even with the chamber and additional vent holes in the molds. So I decided to add a piece of styrene to the insides of the side wall frames. This would allow any bubbles to get caught in this area and then I can sand all of the excess down to where it needs to be and it will look a lot better than the other way I was trying it. Since I've never attempted any casting project of this magnitude with hollowed out parts it's all been trial and error.

        On my 1/350 scale dock I didn't fully think through the top part of the modules. As I've stated before, I had never thought I would be selling that model much less building 2 larger drydocks. But the 1/350 scale version was a reminder of what I needed to do to simplify and correct some problem areas on these new ones. On the 1/350 to panels I had put some hinged access panels on the topside. I could then flip them open to fix any wiring problems. Because I made the entire model from .080 sheet styrene I found that it was not strong enough to remain squared and level when additional weight was added. Parts of the modules started to sag ever so slightly, but enough to not allow the hinged panels to close over the tops completely flat. Hence: Light leaks. This was repaired when I gave the model a facelift and corrected many of those flaws.

        With this build I am using Steel and Aluminum framework as well as a much thicker module panels made from as strong resin. These modules are very sturdy and they weigh much more than the sheet styrene version.

        In this month's update I worked on making the top panels of the module removable rather than hinged. I put guide screws on the insides of the wall panels, then I took some angle aluminum and cut notches into them so that the angle aluminum will slide onto the screws in the side walls. I will now be fastening the angle aluminum to the top panels from the inside. When the panels are in place they will fit into a groove that runs around the entire topside of the side walls. This will make the top panels fit snug onto the side walls and the lip that the top panels sit on will help block out any light leaks. I'd say I thought this one out a little better for this build and any other I might build in the future.

        In other updates, I've added all of the front light panel frames to the lower modules so that I can begin the painting process. Although I do like the paint I used on the 1/350 scale build which was Model Master "Rust" color, I want to try an match the color a little better to the original color seen in ST:TMP. I will let you decide what you think about the new color. The pics will be in the Update by June 4th.

        See you next update!

        Mark
        Last edited by NemVia; Jul 11, '17, 4:32 PM.
        ...Once it's activated, there's no way to stop it! - Scotty: DMa
        www.NemVia.org

        Comment

        • NemVia
          Museum Patron
          • Oct 12, 2007
          • 123

          #5
          September Updates - 2013

          Hi Everyone. I finally got my PC back and all repaired so now I can add the picture updates for the last couple of months. There are 15 new pics in the September Updates page this month.

          I've mainly been working on the panel frames, the anchor assembles that are seen between the panel frames and I've been casting hundreds of pieces so that I can start the assembly of all of these pieces. The castings include 980 of the anchor cones for both docks, all of the front light panel frames are now cast for both docks, and I have all but nine of the 84 back light panels finished as of this posting. I've had to sand down the bottoms of the cones as well as drill out the holes for all of the rods to fit through. The fronts and backs of all of the light panels is up next. I've had to wait on some suppliers for some more of the frame tubing and a few other parts as well. But I have been assembling the anchors together. I have 33 of them done so far. There are 107 more to do.

          After these are finished I can start drilling out the holes for the tension rods on the light panels, and do some of the pre painting work to get everything ready for final assembly.

          A lot of work ahead, but I'm getting closer to finishing. Keep checking for updates. Thanks for being patient while my computer was down.

          See you next month.

          Mark
          Last edited by NemVia; Jul 11, '17, 4:32 PM.
          ...Once it's activated, there's no way to stop it! - Scotty: DMa
          www.NemVia.org

          Comment

          • NemVia
            Museum Patron
            • Oct 12, 2007
            • 123

            #6
            November Updates!

            Hi everyone!

            I apologize for the long intervals between updates, but for October all I did was a lot of drilling and aligning and drilling and aligning and..... well, you get the point. So, I thought I would wait an extra month so you can at least see some progress with the dock.

            Because using metal in model construction is not a forgiving as with plastics, one has to be more precise with the drilling and bending of tubing and other pieces, so yes, it does take a little longer to get things done, but I'll tell you, in this case at least it will be worth the wait.

            In this month's update I've finally been able to test fit some of the panel frames with the main modules. As I said In other updates I needed to wait for some parts to come that were back ordered. The back ordering occurs because of the quantity of items that I need for these projects. I've had to order 164 copper tubes, about 56 or so threaded rods and a couple hundred dome and regular nuts and so forth. I've had to cut a lot of these items to length and make sure they fir properly into their respective pieces. This is definitely a take-your-time and do-it-right-the-first-time projects(s).

            Other than the panels frames, there will be very little to solder together. Following the design of ST:TMP filming miniature there will be a lot of screws, nuts and bolts holding this baby together. If you watch all of the drydock scenes including the Enterprise leaves drydock you will see a lot of these details right on the screen.

            But anyway, this isn't a just drill it and put it together project. This updates I've started by adding the anchor cone pieces to the outside parts of the overhead module, then I have to take each panel frame individually make sure that each of the holes both on the module side as well as on the side and bottom frames will line up. I've started on the top tier of frames on only one of the module pieces. Now that I know what to do I can get the other tiers lined up and in place. With all of the threaded rods and dome nuts in place I was very pleased to find that the panel frames are able to support their own weight so when all of the pieces are finally in place I will not need additional supporting rods to hold everything up as I did with the 1/350 PLE drydock. This is also something that TMP dock was able to do.

            All the pics in this month's update are pretty much test-fitting pictures to make sure everything lines up correctly. I will not be able to permanently weld everything together until I can get the wiring in place for the light panels and other effects. There are 19 new pics in the November Updates tab.



            By next update I hope to have the tiers finished on at least one of the modules. We'll see how it goes. I will try to get as much done as possible in the next month because December is a very bad month for me secular jobwise, so I hope you enjoy the new progress pics and hope to hear from you. All comments positive and negative are welcome!

            For those of you visiting for the first time, please sign up as a member and be the first to receive notice of any updates on my site.

            Talk to you next month! Take care and Happy Modeling!

            Mark
            Last edited by NemVia; Jul 11, '17, 4:32 PM.
            ...Once it's activated, there's no way to stop it! - Scotty: DMa
            www.NemVia.org

            Comment

            • NemVia
              Museum Patron
              • Oct 12, 2007
              • 123

              #7
              December Updates

              Well, here we are! Another month goes by and we are already into December.

              I have 10 new pics for your viewing the DECEMBER UPDATES - 2013 page on the left sidebar menu on my site. I've spent the good majority of November working just on the panel frames. The hole alignments have to be pretty precise so it takes quite a bit of time to get everything just right. For each of the sides, both port and starboard, I could only fully assemble five panel frames each with all three tiers. The reason being that the last to panels on the fronts and rears of each side on all three tiers need to be left unsoldered together so that I can thread the lighting effects through the end sections and through the tubing of each tier and to each light panel.

              Did you get all of that? Well, if you didn't just wait for the wiring update and you'll see what I'm talking about. But so far, everything is fitting in place and all of the tiers seem very sturdy and will be able to support their own weight as they will be freely hanging from the sides of the overhead module. There should be no supporting rods like I needed with the 1/350 drydock model for this build.

              In other news, which in this case is GOOD news, I was able to get the Drydock's steel frames back from the welder this week. They are built very similar to the 1/350 scale version except that I am not using copper piping. These frames are made from steel to support the weight of both the dock and the DeBoers Model. I will now be making the necessary holes in the overhead modules to anchor them to the steel frame. After this is done I will be drilling out all of the holes needed in the support frame to bolt the modules to it as well as holes for casters that will be used to move this large model around to be worked on. I have made this frame so that the lower section or Dolly can be removed so the model can be hung on a wall of my client so desires. Anyway, after the holes are all drilled out I will be sanding the entire frame(s) down and spraying the entire assembly with Rustoleum to prevent any more oxidation on the metal.

              December is usually an unfruitful month for me as far as work on the models goes. Our company gets quite overwhelmed with work during this month, so the January update might be a little lean with pictures, but we'll see how everything goes. Well, that's my update for this month!

              Hope everyone enjoys the pics! As always, be safe and happy modeling and I will see you in January! Take care,

              Mark.
              Last edited by NemVia; Jul 11, '17, 4:32 PM.
              ...Once it's activated, there's no way to stop it! - Scotty: DMa
              www.NemVia.org

              Comment

              • NemVia
                Museum Patron
                • Oct 12, 2007
                • 123

                #8
                Hey! Been busy this month But should be able to resume work on the dock. Just minor updates on my site. Give me a few more weeks and I'll have some new pics!

                Thanks, Mark
                Last edited by NemVia; Jul 11, '17, 4:32 PM.
                ...Once it's activated, there's no way to stop it! - Scotty: DMa
                www.NemVia.org

                Comment

                • NemVia
                  Museum Patron
                  • Oct 12, 2007
                  • 123

                  #9
                  For the 1/260 Drydock Updates, I have added the latest progress pics in the February updates page. I've been able to sand down the steel frames to prepare them for spraying. They will be sprayed Flat Black to hide the fact that they are supporting the models. I put a couple of pics to show how the frame can be mounted to a wall for display. For the rest of this month's update I had to cut holes into the overhead module side panels to allow the support tubes to slide through. Then I was able to bolt the module frames to the tubes so they are now permanently anchored to the frame. I've also started adding the anchor cone pieces to the center sections of the modules. These have to be done one at a time to make sure the anchors line up with the holes on the modules. There are 70 of these total on each of the Drydocks.

                  I've also ordered some Dry-Transfer Lettering that will later be used to mark all of the light panels according to ST:TMP flyby scene. During the month of February I will be drilling the tension rod holes for all of the light panels and their frames and then mounting all of the panel frames to the Port side or rear Modules. If I can get all of this in place I will be able to start threading the EL Wire for the lighting effects. Take care for now and I'll see you next month!

                  Mark
                  Last edited by NemVia; Jul 11, '17, 4:33 PM.
                  ...Once it's activated, there's no way to stop it! - Scotty: DMa
                  www.NemVia.org

                  Comment

                  • NemVia
                    Museum Patron
                    • Oct 12, 2007
                    • 123

                    #10
                    March Updates 2014


                    Hi everyone! It's been a very very cold winter here in Illinois this year and unfortunately that is putting me behind on my drydock build a bit. Most of my shop is in my garage and it is extremely difficult to work on certain things when its 0 deg. or colder out there. But I've managed to do some smaller work on the project and was able to get some things done.

                    In this update I have had a change in some of the detailing work that needs to be done on one of the docks. It was requested that I put some more detail into parts of the dock specifically around the light panels and panel frames. My client wants some turnbuckles added to the panels as was seen in one of the close up models in ST:TMP. So I've ordered s few special tools that I do not have, such as a small pen sized screwdriver and a pin vise adjustable chuck so that I can drill out some 700+ holes in the panel frames and light panels using a 1mm drill bit. This is so I can add some turnbuckle anchors for the tension rods. These will all be connected to the light panels and there frames vial the rods and some very tine screws and nuts. I think I'm also going to need a larger magnifying glass as well.

                    In the March updates I have pics of how I did this. It takes a lot more time whereas the 1/350 model I just drilled the holes into the frames and panels and then cemented the tension rods into place and then I was done. Not so easy this time but I think it will be worth the effort.

                    I've also been busy reviewing specific details that need to be done by viewing the drydock scene in ST:TMP. One thing that I really noticed this time is that there are 2 different colors seen on all of the light panels. When they filmed the miniature they used a lot of lighting to get the shots they needed and that appears to have washed out the color differences on the panels to a certain degree. Comparing what's on the screen to Adam Schneider's refurbished Drydock model It's easier to see the differences now and what I need to do. So the panels will need to be sprayed no less than 2 different colors. I've been ordering the paints that I need for this part of the job. There is also a tremendous amount of detail between each of the panel frames and just about all sides of each of the frames, so I will be making mold masters of specific details so I can add them in before I start spraying the entire model.

                    The dry transfers I ordered have some in so when I finish the panels I can start adding on their specific numbers.

                    I've been asked where I get some of my material for the detailing of this model. I have a lot of reference materials including pictures of the actual miniature and over the years I have found some very rare behind the scenes photos from when they filmed the movie. I've included those in the March update Page for those of you who are interested. Well that's it for now. See you next month.

                    Mark
                    Last edited by NemVia; Jul 11, '17, 4:33 PM.
                    ...Once it's activated, there's no way to stop it! - Scotty: DMa
                    www.NemVia.org

                    Comment

                    • NemVia
                      Museum Patron
                      • Oct 12, 2007
                      • 123

                      #11
                      This month I have been able to get somewhat back on track. The weather has warmed up enough for me to go back into my garage to do some of the necessary work that can't be done inside our house.

                      I have 23 New Pics in the April Updates. Here are the details:

                      I have finally received the armatures for the models that will be used to marry the Enterprise models to the docks. They are made of 1/4" hollow tube and are quite sturdy. I had them welded together in a specific manner so that they will be hidden as best as possible inside the dock and the ship giving the illusion that the ship is floating inside the dock.

                      All of the copper tubes that I cut the holes into have been placed inside the panel frames. These will be used to support the light panels as well as allow me to run the lighting effects through each of the tubes.

                      I have also started painting the light panels their respective colors. This took about a week to do. I was able to finish those and start work on the dry-transfer numbers and letter that are on each of the panels. In ST:TMP the dock was heavily decaled only on the side that was visible on the screen. The side unseen or port side has decaling but not to the extent of what Row "E" of the panels has. As I have more time I will be adding more of the decals to each of the panels since this will be a full model of the dock. The bummer about the dry-transfers is that they only give you so much of certain letters and/or numbers. For instance many of the panels are numbered in the 30's and 70's. Guess which numbers they give you the least amount of? Yeh... 3's and 7's so I have to order many many sheets of the transfers and then try to use the other numbers just so I don't waste too many of the decals. But.... hey.... that's the life of a model builder, huh? Anyway I think Row "E" which is seen on the screen turned out rather nice.

                      Now, another feature of the Light panels is seen on the upper right and left side of each of the panels. Since I don't know what they really are I am going to call them the power nodules for the light panels. I used reference pictures from the movie as well as some pics I shot of the Filming Miniature to scratch build a highly detailed master so that I can cast all of these pieces rather than build them all individually. Just a side note, it took me about 4 hours total to create just one of these from scratch. The only thing left that I need to do for these pieces is build the 2 tanks or bottles that are seen on the top and bottom of the light panel support poles. These will be cast separate from the nodule pieces as well as a clamp-like piece that connects these nodules to the light panels. I should have them done by the next update.

                      Last but not least I am taking some new measurements for some interior sections of the dock can be seen from the outside. I am going to do what I did for my 1/350 scale dock and that is add a large interior Hanger bay that can be seen by looking into the Aft End of the dock though the hanger doors. I have a lot more room to work with on this dock and I purposely made the support frame so this dock can be a lot larger than the 1/350 version. You will be able to see many Shuttles, work bees, Shuttle pods, cargo containers and other details. This should help give a great depth of scale to the model and how large it would be in real life.

                      Hopefully by next month's update I will have some of the panel frames painted up and ready to be connected to the Overhead modules. Hopefully there will be no Hang-ups or snags. The weather is getting better, slowly but surely. This will make things go a lot faster. 'Til then, see you next month!

                      Mark
                      Last edited by NemVia; Jul 11, '17, 4:33 PM.
                      ...Once it's activated, there's no way to stop it! - Scotty: DMa
                      www.NemVia.org

                      Comment

                      • NemVia
                        Museum Patron
                        • Oct 12, 2007
                        • 123

                        #12
                        Hey Everyone!

                        This month I've spent quite a bit of time casting many different pieces for the Light Panels as well the panel frames. The focus was mainly on the Power Nodules that are seen on either side of the tops of each of the side light panels. I needed to cast these parts in two different pieces because of the complexity of each part. There are 84 nodules on each of the docks so I had to cast 84 nodules as well as 84 of the clamp pieces.

                        There are also 2 tanks that are on each of the nodules that I needed to build from scratch. There are 168 of these needed per dock, so I made castings of those and painted some of them light gray. The end pieces on all of the tanks will be hand painted neutral gray. When the Nodules are finally painted I can then cement all of the tanks to the Nodules. Whew! A lot of work in the coming months.

                        Other parts that needed to be cast were the box like recesses that are seen underneath the overhead modules. There are 7 per module. They were challenging for me to cast because of how thin the walls are. Added to that was also a slit on the front and back parts of these pieces that are used for allowing light to shine through for additional effects. I never knew these slits were on the model until I was able to see the Drydock Miniature in person. Be assured they are there, they just never had any screen-time in the movie.

                        In other updates you should know that despite all of the obvious details seen on the Overhead modules there is also an abundant amount of details that follow the inside and outside parts of all of the framework for the side panel frames. I made up 8 different versions of the detailing and made molds of them. Now when I add them as details to the dock I can use them at random and also flip them upside down so they will appear as even more details. These will be used for the horizontal parts of the framework. I also made up 3 additional detail pieces for the vertical parts of the framework which also can be flipped over for different details. I found it was faster to use more that enough resin so that I can pull all of these pieces out of the mold at the same time, then use a belt sander to get rid of all of the excess resin and thin out the strips. You'll see what I mean in the May Updates page.

                        I have been able to apply the horizontal strips of details to the panel frames where the anchors hold the frames together. Eventually I will be able to start painting the frames and assembling them to the modules.

                        In The last week or so I have started painting the Power nodules. I applied the first color which is Intermediate blue and I've started masking off the nodules to add the second color which will be Rust. Later I will hand paint some of the smaller details with a small brush. I was hoping to get at least one of these done for this month's update but I just couldn't get that much done. Sorry! I tried. When I get one of them painted up I'll post ASAP. And last but not least I've begun casting pieces for the hanger bay for the overhead module. I'll have some pics for that next update. There are 25 new pics in the May Updates page! Enjoy! and I'll see you next month!

                        Mark
                        Last edited by NemVia; Jul 11, '17, 4:33 PM.
                        ...Once it's activated, there's no way to stop it! - Scotty: DMa
                        www.NemVia.org

                        Comment

                        • NemVia
                          Museum Patron
                          • Oct 12, 2007
                          • 123

                          #13
                          Hello Fellow Model Builders!

                          Although I don't have a lot of update pics for you this month, I have done I good chunk of painting details onto many, many pieces. The square box insert pieces for the overhead modules have been airbrushed to their final color and the lighting slits have been cut into each of these pieces. I have a good pic of one of these as a test fitting pic in the June Updates page.

                          Another chunk of the work load for this month was hand painting some of the details for the Light Panel Power nodules. There are 4 different colors on each of these pieces now and there are 84 of these pieces for each drydock model that needed to be painted. I have also been hand painting some of the details on the end caps of the tanks that will later be cemented to the power nodules. IT's easier to cast them in groups of 4 and paint them while they are still on the sprue pieces. When they are finished I can just snap the tanks off and then cement them onto the nodules. I'll have some pics of that in next month's update.

                          As long as I had my airbrush out I started to paint some of the vertical detail pieces for the light panel frames. I first had to sand down the back parts of these pieces so that they are now pliable enough and can now be curved with some amount of ease when they are put onto the panel frames.

                          That's what I have been doing for the most part for this month. But I also figured out how many more of each of these pieces that I need to finish the model and have been doing a lot more resin casting. By next update I should have all of the needed pieces cast and then painted and THEN I can get to work assembling all of the parts.

                          In the next month I will also be working on the hanger for the overhead modules. I know I started that a few updates back, but I really needed to concentrate on getting all of these detail parts cast and painted. You should start to see the beginnings of the work crane and work light modules and booms in the coming months.

                          Thanks for being patient with this build. I know it's taking a while to get anywhere, but soon I can assemble everything and then we will start to see some awesome results. Keep checking for updates and I'll see you next month!

                          Mark
                          Last edited by NemVia; Jul 11, '17, 4:33 PM.
                          ...Once it's activated, there's no way to stop it! - Scotty: DMa
                          www.NemVia.org

                          Comment

                          • NemVia
                            Museum Patron
                            • Oct 12, 2007
                            • 123

                            #14
                            Hi everyone. Just letting you know that the update for July is bare minimum. Had to go on vacation for a couple of weeks (Had to! Yes needed to. I needed a break gaaaaaah!) Anyway, I only did some casting for some of the detailing pieces as well as some sanding and painting. Most of this stuff was seen in an earlier update, so I won't publish similar pics on the sight. I will be starting on the assembling and painting the Starboard side of the drydock and will have some new pics for you for August. Thanks for your patience and I'll see you then.
                            Mark
                            Last edited by NemVia; Jul 11, '17, 4:33 PM.
                            ...Once it's activated, there's no way to stop it! - Scotty: DMa
                            www.NemVia.org

                            Comment

                            • LordMudd
                              Persistent Member
                              • Aug 22, 2011
                              • 1331

                              #15
                              I hope you don't mind my asking but after reading your initial post I was wondering why you could not post the pics. I would assume a model like that to be in the care of someone like the Smithsonian Air and Space Museum and I can't imagine them objecting, so I can only conclude that that assumption is wrong.

                              CCC.

                              Comment

                              Working...
                              😀
                              🥰
                              🤢
                              😎
                              😡
                              👍
                              👎